Phone: +86 755 27797118
Fax: +86 755 27797998
Email: zhilibao@szzlb.com
To make a good denture need through the complex process, each step should conscientiously do a good job, can achieve high quality because of denture, denture, every process is the basis for later in the process, after a process is a continuation of the previous procedure, a ring buckle ring, error of any procedure, which may affect the denture quality, even cause failure. Production process of denture can be divided into four stages, including more than a dozen steps, briefly introduced as follows:
The first stage is the oral examination and preparation, the second stage is the third stage of replication, oral status of patients is denture design, model on the fourth stage is the production of denture stage.
Address:4F,B3 Block,Huafeng Shiji Technical Zone,Hangcheng Ave,Gushu Xixiang Town,
BaoAn,Shenzhen,ChinaPostal Code: 518126
Tel: +86 755 27797118 27797228 27797338
Fax: +86 755 27797998
Website: http://www.szzlb.com
Email: zhilibao@szzlb.com